top of page
PRESWERX logo
PRESWERX_Pattern_Accent02.png
Water & Water Waste

East Boynton Water Treatment Plant Upgrade

Client

Hazen and Sawyer

Project Owner

City of Boynton Beach

Location

Boynton Beach, Florida

Project Value

Industry

Water & Water Waste

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Renderings & Animations
Still Renderings
PRESWERX_Pattern_Accent02.png
Water & Water Waste

East Boynton Water Treatment Plant Upgrade

Client

Hazen and Sawyer

Project Owner

City of Boynton Beach

Location

Boynton Beach, Florida

Project Value

Industry

Water & Water Waste

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Renderings & Animations
Still Renderings
Image1-FPO.jpg

Project Overview

The East Boynton Water Treatment Plant Upgrade was a facilities planning and infrastructure improvement project for the City of Boynton Beach, Florida. The scope evaluated treatment options and upgrades across the existing facility, including sand and granular filtration pretreatment, nanofiltration membranes, electrical infrastructure from 13kV to 480V, Motor Control Center equipment, and SCADA and automation controls. The work was driven by the need to meet emerging contaminant regulations and prepare the facility for evolving potable water standards. The client engaged PRESWERX to produce renderings and animations that would communicate the proposed improvements visually for the pursuit.

Image1-FPO.jpg

Client Challenges

The client needed to communicate a technically dense water treatment upgrade to a municipal owner in a way that was accessible and compelling. The core challenges included: 

  • Translating complex treatment process upgrades, including nanofiltration membranes, MCC equipment, and SCADA automation, into visuals that a nontechnical municipal audience could evaluate. 

  • Conveying the full scope of a phased infrastructure improvement spanning treatment processes, electrical systems, and control systems within a single, coherent narrative. 

  • Differentiating the team's approach and technical expertise in a competitive pursuit for a public utilities client. 

These challenges required visual communication that simplified technical complexity without undercutting the depth of the engineering work proposed.

Image2-FPO.jpg

Scope of Work

PRESWERX produced a suite of renderings and animations tailored to support the pursuit of the East Boynton Water Treatment Plant Upgrade. The deliverables were developed to make the proposed treatment process improvements legible to a municipal owner audience, illustrating the facility's upgrade path across filtration systems, nanofiltration membranes, electrical infrastructure, and automation controls. Animations were used to communicate process flows and system interactions that static drawings could not convey effectively. Each visual was built around the specific scope of the East Boynton facility and aligned to the standards the City of Boynton Beach would expect for a potable water infrastructure engagement.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX approached this as a translation problem: the technical depth of the proposed upgrades needed to reach a municipal decision-maker in a form they could evaluate with confidence. 

  • Developed renderings that depicted the physical scope of the facility upgrades, from treatment process components to electrical and control system improvements. 

  • Produced animations that visualized process flows and system automation in a way that static graphics alone could not capture. 

  • Calibrated all visuals to the City of Boynton Beach's perspective as a municipal water utility owner evaluating a long-term infrastructure investment. 

The result was a visual package that made a technically complex pursuit accessible without oversimplifying the engineering behind it.

Results Delivered

PRESWERX delivered a complete set of renderings and animations that gave the client's pursuit materials a clear visual foundation for communicating a complex infrastructure upgrade: 

  • Renderings that accurately depicted the proposed facility improvements and gave the municipal owner a concrete sense of the physical scope. 

  • Animations that translated treatment process flows and automation system upgrades into a format accessible to a non-technical audience. 

  • A cohesive visual package that reinforced the client's technical credibility and presented the proposed upgrades with the clarity expected for a potable water infrastructure pursuit. 

The client's team entered the selection with visuals that matched the quality and rigor of the engineering work behind them.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

Untitled.jpg

University of North Florida Coggin College of Business Phase 1 & 2

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page