Coral Springs Membrane Water Treatment Plant

Client

Hazen and Sawyer

Project Owner

City of Coral Springs

Location

Coral Springs, Florida

Project Value

$20,200,000

Industry

Water & Water Waste

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
PRESWERX_Pattern_Accent02.png
Water & Water Waste

Coral Springs Membrane Water Treatment Plant

Client

Hazen and Sawyer

Project Owner

City of Coral Springs

Location

Coral Springs, Florida

Project Value

$20,200,000

Industry

Water & Water Waste

Account Executive(s)

Joshua Harden, Tom Thomas

Services Provided

Presentation Coaching
Presentation Development
Proposal Development
Renderings & Animations
Image1-FPO.jpg

Project Overview

The City of Coral Springs initiated a significant infrastructure modernization effort, replacing its aging lime softening water treatment plant with a new membrane water treatment facility valued at $20.2 million. The project positioned the City to proactively address emerging contaminant concerns, including PFAS, well ahead of regulatory pressure. Hazen and Sawyer engaged PRESWERX to support the pursuit with a full suite of services, including proposal development, presentation design, presentation coaching, custom renderings, and animations.

Image1-FPO.jpg

Client Challenges

Competing for a technically complex municipal water infrastructure project required the client to communicate both engineering depth and long-term vision to evaluators:

  • Translating a highly technical membrane treatment scope into a compelling, owner-focused narrative for a municipal evaluation panel

  • Visualizing the completed facility in a way that conveyed quality and long-term value before construction began

  • Differentiating the team in a competitive procurement process for a high-priority public works project

  • Preparing the team for a high-stakes oral selection presentation with a consistent, confident story across all speakers

Together, these challenges demanded a pursuit strategy that combined strong written content, polished visuals, and a rehearsed, unified presentation.

Image2-FPO.jpg

Scope of Work

PRESWERX delivered a comprehensive pursuit package for the Coral Springs Membrane Water Treatment Plant pursuit. The scope included a fully written and formatted proposal tailored to the City's evaluation criteria and the technical demands of a membrane treatment facility replacement. PRESWERX developed a custom presentation designed to guide evaluators through the project approach and team qualifications in a clear, visually engaging format. Architectural renderings and animations were produced to illustrate the completed facility, giving the client a powerful tool for conveying design intent and project scale. Presentation coaching sessions prepared the team for the oral selection phase, with a focus on consistent messaging and confident delivery.

Image3-FPO.jpg
Image4-FPO.jpg

PRESWERX Approach

PRESWERX approached this pursuit as an embedded strategic partner, aligning each deliverable to the evaluator framework and the City's stated priorities around infrastructure modernization and contaminant readiness.

  • Developed a proposal narrative that framed the membrane plant investment in terms of the City's long-term water quality goals, with particular emphasis on proactive PFAS preparedness

  • Produced renderings and animations that gave evaluators a concrete visual understanding of the future facility, reinforcing confidence in the design and the team's capabilities

  • Conducted structured presentation coaching to align team members on key messages, sharpen delivery, and ensure the oral presentation reflected the same story told in the written proposal

The result was a fully integrated pursuit package where every element reinforced the client's qualifications and readiness to deliver a facility built for both present needs and future challenges.

Results Delivered

PRESWERX delivered a complete pursuit package held to the standard of a major public infrastructure procurement, giving the client a polished, professional presence at every stage of the selection process.

  • A fully developed proposal that communicated the technical scope, team qualifications, and long-term value of the membrane treatment approach in clear, evaluator-focused language

  • Custom renderings and animations that brought the facility to life visually, enabling evaluators to see the project before a single shovel hit the ground

  • A coached, presentation-ready team aligned on messaging and confident in delivery heading into the oral selection phase

The client entered the final selection stage with a cohesive pursuit strategy, a compelling visual story, and a team fully prepared to make the case for why this project belonged in their hands.

Image5-FPO.jpg
PX_Pattern_Bright-Blue_2.jpg
Static_6-2560x1271 (1).png
Focused on the Built ENVIRONMENT

From Pursuit Strategy to Final Presentation—We’ve Got You Covered.

Untitled.jpg

Baptist Health of Northeast Florida Free-Standing Emergency Department & MOB

Untitled.jpg

Town of Cary Sports Complex

Untitled.jpg

University of North Florida Coggin College of Business Phase 1 & 2

FILTER BY PROJECT TYPE
SUCCESS STORIES

Proven Results Across High-Stakes Pursuits

Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.

bottom of page